Skip To Main Content

Toggle Close Container

Header Schools - Home & Address

School Address

9400 N. Central Expressway
Dallas
TX
75231

Header Holder

Header Left Column

English

Header Call to Actions

Header Logo Container - Desktop

Header Right Column

Wrapper - Search Toggle & Dropdown

Header Logo Container - Mobile

Toggle Menu Container

Canvas Menus Containers

District Canvas

Close Canvas BTN - Container

Schools Menu Slider

description here

Schools Tabs

Search Canvas Container

Horizontal Nav

Breadcrumb

Mata Montessori celebrates progress on 30,000-square-foot addition financed by 2015 bond

Mata Montessori celebrates progress on 30,000-square-foot addition financed by 2015 bond
The Hub

Eduardo Mata Montessori School celebrated reaching the halfway point of work on its new
30,000-square-foot school addition with a topping out ceremony.

Four girls are gathered around a weathered metal beam in the foreground, writing on it with markers, while a blurred background of trees and dirt suggests an outdoor setting.
Students sign the construction beam.

Imperial Construction, the general contractor for the $30 million Bond 2015 project, placed a piece of structural steel in front of the school for current students to sign. The beam was then hoisted into place as staff and students watched from a safe distance along the Katy Trail.

A group of young children, some waving, stand in front of a blurred background of more children and trees.
Student cheer the construction progress at Mata Montessori.

In addition to the building addition that doubles as a storm shelter, the scope of work includes replacing the fire alarm and PA system, renovation of administrative areas, select student restrooms, construction of a secure vestibule, new parking, fire lane loop, and playground upgrades.