Mata Montessori celebrates progress on 30,000-square-foot addition financed by 2015 bond

0

Eduardo Mata Montessori School celebrated reaching the halfway point of work on its new
30,000-square-foot school addition with a topping out ceremony.

Students sign the construction beam.

Imperial Construction, the general contractor for the $30 million Bond 2015 project, placed a piece of structural steel in front of the school for current students to sign. The beam was then hoisted into place as staff and students watched from a safe distance along the Katy Trail.

Student cheer the construction progress at Mata Montessori.

In addition to the building addition that doubles as a storm shelter, the scope of work includes replacing the fire alarm and PA system, renovation of administrative areas, select student restrooms, construction of a secure vestibule, new parking, fire lane loop, and playground upgrades.

Share.

Connecting you to the personalities, places and perspectives of Dallas ISD

Exit mobile version